参考答案和解析
正确答案:C
更多“When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary ”相关问题
  • 第1题:

    That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.

    A.separate laytime for loading and discharging

    B.total laytime for loading and discharging

    C.commencement of laytime

    D.laytime commencement of loading and discharging


    正确答案:B

  • 第2题:

    ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Homogeneous hold loading condition


    正确答案:B

  • 第3题:

    Bonding cables are used during cargo transfer to ______.

    A.provide safe electrical power connection to barge equipment

    B.keep the vessel from surging excessively

    C.prevent an accidental discharge of static electricity

    D.secure the cargo hose to a hatch when loading overall


    正确答案:C

  • 第4题:

    单选题
    Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().
    A

    a subsequent temperature rise will cause the cargo to overflow

    B

    air pockets may cause the cargo to bubble out of the ullage hole

    C

    the increased viscosity of the product requires higher loading pressure which increases the chances of a spill

    D

    the tank valve may be stiff and a spill will occur before the valve can be closed


    正确答案: B
    解析: 暂无解析

  • 第5题:

    单选题
    When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().
    A

    remove an existing list that would slow down cargo operations

    B

    initiate loading in conjunction with unloading at the hatch

    C

    improve stability during cargo operations

    D

    allow longshoremen easy access to the hatch


    正确答案: D
    解析: 暂无解析

  • 第6题:

    单选题
    A ship is responsible for the cargo loaded or unloaded().
    A

    only when the cargo is within its rail

    B

    after the cargo is checked by tallymen

    C

    as soon as the cargo loading or unloading begins

    D

    during the time when loading or unloading is going on


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    The ship will be responsible for the cargo loaded or unloaded().
    A

    only when the cargo is within its rail

    B

    during the time when loading or ynloading is going on

    C

    after the cargo is checked by tallymen

    D

    as soon as loading or discharging begins


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    装卸货之前,打开舱盖。()
    A

    After loading and discharging, hatch covers will be opened.

    B

    After loading and discharging, hatch covers will be closed.

    C

    Before loading and discharging, hatch covers will be opened.

    D

    Before loading and discharging, hatch covers will be closed.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    The expenses for the loading of trucks and heavy cargo and the necessary materials for lashing thereof will be charged to()account.
    A

    the supercargo's

    B

    the shipper's

    C

    the shipowner's

    D

    carrier's


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    How()the cargo at loading port?
    A

    about

    B

    in

    C

    with

    D

    from


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Bonding cables are used during cargo transfer to().
    A

    provide safe electrical power connection to barge equipment

    B

    keep the vessel from surging excessively

    C

    prevent an accidental discharge of static electricity

    D

    secure the cargo hose to a hatch when loading overall


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().
    A

    provide the proper trim

    B

    prevent negative stability from developing

    C

    prevent excessive longitudinal stresses

    D

    control list


    正确答案: C
    解析: 暂无解析

  • 第13题:

    When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.

    A.Available dunnage,and chocking

    B.Crushability,and inherent vice

    C.Sweat,and weight

    D.Weight,and refrigeration


    正确答案:D

  • 第14题:

    ______ is not one of the more commonly adopted solid bulk cargo distributions.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Inhomogeneous hold loading condition


    正确答案:D

  • 第15题:

    单选题
    The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().
    A

    after its arrival at the destination

    B

    during the ship's voyage at sea

    C

    before they come to the dock

    D

    during the time when the loading or diacharging is going on


    正确答案: C
    解析: 暂无解析

  • 第16题:

    单选题
    In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
    A

    is not

    B

    has not

    C

    do not

    D

    does not


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    When loading or unloading baled cargo on board,the straps()to lift or drag the bales.
    A

    are forbidden

    B

    are allowed

    C

    can be used

    D

    are usually used


    正确答案: A
    解析: 暂无解析

  • 第18题:

    单选题
    When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
    A

    available dunnage,and chocking

    B

    crushability,and inherent vice

    C

    sweat,and weight

    D

    weight,and refrigeration


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    The term Loading and unloading Cargo means().
    A

    arranging cargo

    B

    shipping cargo

    C

    cargo handling

    D

    weighing cargo


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    ()is known as a long hatch during loading operation.
    A

    The largest hatch of a ship

    B

    The hatch that is double rigged

    C

    The hatch where a disproportionate amount of cargo is atowed

    D

    The hatch where the most cargo is stowed


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.
    A

    lashing

    B

    shifting

    C

    lifting

    D

    tallying


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    What would you consult to determine the number of persons required on duty while loading a cargo of leaded gasoline on your tanker? ()
    A

    the Matitime Code of China

    B

    Certificate of Inspection

    C

    Oil Transfer Procedures Manual

    D

    IOPP Certificate


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    我们正在装危险货。()
    A

    We are loading flammable cargo.

    B

    We are loading dangerous cargo.

    C

    We are discharging flammable cargo.

    D

    We are discharging dangerous cargo.


    正确答案: C