单选题Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recomm

题目
单选题
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()
A

Use the 60 Amp line cords

B

Change the 100 Amp connector to a 60 Amp circuit

C

Submit an RPQ to order the p5 590 with 100 Amp power cords

D

Change the configuration and order the p5 590 with the 100 Amp power cords


相似考题
参考答案和解析
正确答案: D
解析: 暂无解析
更多“Companycom is purchasing a p5 590 which was configured with ”相关问题
  • 第1题:

    Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()

    • A、The p5 595 would allow for COD
    • B、The p5 595 includes the Advanced Power Virtualization hardware and software
    • C、The p5 595 is priced the same as the p5 590 given the same number/type of CPUs
    • D、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs

    正确答案:A

  • 第2题:

    Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()

    • A、LPAR Validation Tool (LVT)
    • B、Personal Systems Configurator (PSC)
    • C、IBM Configuration for eBusiness (eConfig)
    • D、Advanced System Management Interface (ASMI)

    正确答案:A

  • 第3题:

    Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()

    • A、Upgrade the p690 to a p5 590 server running AIX 5.3
    • B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
    • C、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
    • D、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization

    正确答案:D

  • 第4题:

    Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()

    • A、The server must be installed into a location with a raised floor for optimum system cooling  and cable management.
    • B、The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.
    • C、The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.
    • D、The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.

    正确答案:A

  • 第5题:

    Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()

    • A、Use the 60 Amp line cords
    • B、Change the 100 Amp connector to a 60 Amp circuit
    • C、Submit an RPQ to order the p5 590 with 100 Amp power cords
    • D、Change the configuration and order the p5 590 with the 100 Amp power cords

    正确答案:D

  • 第6题:

    During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()

    • A、The IBM CE will install the card
    • B、The card will not be supported by IBM
    • C、The AIX device driver should work fine
    • D、The customer is correct, there should be no problem

    正确答案:B

  • 第7题:

    单选题
    A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
    A

    A CD or DVD with installation media

    B

    An internal SCSI adapter in the target LPAR

    C

    An Ethernet adapter for access to an FTP server

    D

    Advanced Power Virtualization feature of the p5 590


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
    A

    Enable DHCP server on the HMC

    B

    Configure host name and IP address on DNS server

    C

    Manually set the IP address of the service processor

    D

    Connect a RS-232 cable from the HMC to the service processor


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
    A

    The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP  addresses.

    B

    A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.

    C

    Network communications can be implemented through an open network. No private network  is required but it is recommended.

    D

    All p5 590 and 595 servers are shipped with one service processor card. A private network is  required to manage DHCP addresses.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Which server houses the database partitions in the AIX BCU V2.1? ()
    A

     IBM System p5 570  

    B

     IBM System p5 575  

    C

     IBM System p5 590  

    D

     IBM System p5 595


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()
    A

    The routes on the HMC

    B

    The firewall setting of the LAN adapter

    C

    The name resolution protocol on the p5 590 server

    D

    The subnet mask settings on the Ethernet adapters


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
    A

    Add CPU and memory COD so they have room to grow if required

    B

    Make the server configuration twice as large as the current requirement

    C

    Configure the server for the current capacity requirements

    D

    Make the server configuration a little larger than the current capacity requirements


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()

    • A、Use lquerypv to read the drive
    • B、Use lspv and look at PP Size value
    • C、Look on the outside of the drive itself
    • D、Use bootinfo to find the LTG on the drive

    正确答案:A

  • 第14题:

    A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()

    • A、The routes on the HMC
    • B、The firewall setting of the LAN adapter
    • C、The name resolution protocol on the p5 590 server
    • D、The subnet mask settings on the Ethernet adapters

    正确答案:B

  • 第15题:

    A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()

    • A、A CD or DVD with installation media
    • B、An internal SCSI adapter in the target LPAR
    • C、An Ethernet adapter for access to an FTP server
    • D、Advanced Power Virtualization feature of the p5 590

    正确答案:A

  • 第16题:

    Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

    • A、VIO Server
    • B、AIX 5.2 ML4
    • C、Shared Ethernet Adapter
    • D、AIX 5.3 with Advanced Power Virtualization

    正确答案:D

  • 第17题:

    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()

    • A、A public internet connection
    • B、All of the Logical Partitions need to be active
    • C、One partition must be configured with Service Authority
    • D、A local Repository must be configured prior to the update

    正确答案:C

  • 第18题:

    Which server houses the database partitions in the AIX BCU V2.1? ()

    • A、 IBM System p5 570  
    • B、 IBM System p5 575  
    • C、 IBM System p5 590  
    • D、 IBM System p5 595

    正确答案:B

  • 第19题:

    单选题
    During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()
    A

    The IBM CE will install the card

    B

    The card will not be supported by IBM

    C

    The AIX device driver should work fine

    D

    The customer is correct, there should be no problem


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()
    A

    New install of AIX

    B

    Migrate the 7040-61D

    C

    Utilize alt_disk_install

    D

    Use the enterprise back up strategy


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()
    A

    From the HMC

    B

    From a NFS mount

    C

    From a FTP server

    D

    From any CD or DVD drive on another server


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()
    A

    Two p5 570 16 way 1.9 MHz machines

    B

    One p5 590 32 way 1.65 MHz machines

    C

    One p5 595 32 way 1.65 MHz machines

    D

    Two p5 570 16 way 1.65 MHz machines


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
    A

    An 8-port adapter to the HMC

    B

    A hub for the private network

    C

    An additional Ethernet card to the HMC

    D

    An additional Ethernet card for each partition


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
    A

    A public internet connection

    B

    All of the Logical Partitions need to be active

    C

    One partition must be configured with Service Authority

    D

    A local Repository must be configured prior to the update


    正确答案: A
    解析: 暂无解析