For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
第1题:
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()
第2题:
A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()
第3题:
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
第4题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第5题:
A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
第6题:
A CD or DVD with installation media
An internal SCSI adapter in the target LPAR
An Ethernet adapter for access to an FTP server
Advanced Power Virtualization feature of the p5 590
第7题:
The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.
A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.
Network communications can be implemented through an open network. No private network is required but it is recommended.
All p5 590 and 595 servers are shipped with one service processor card. A private network is required to manage DHCP addresses.
第8题:
Two p5 570 16 way 1.9 MHz machines
One p5 590 32 way 1.65 MHz machines
One p5 595 32 way 1.65 MHz machines
Two p5 570 16 way 1.65 MHz machines
第9题:
Add CPU and memory COD so they have room to grow if required
Make the server configuration twice as large as the current requirement
Configure the server for the current capacity requirements
Make the server configuration a little larger than the current capacity requirements
第10题:
A SAN device
First I/O drawer
Any I/O drawer within the main frame
First I/O drawer within the expansion frame
第11题:
When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()
第12题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第13题:
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()
第14题:
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()
第15题:
Which server houses the database partitions in the AIX BCU V2.1? ()
第16题:
Enable DHCP server on the HMC
Configure host name and IP address on DNS server
Manually set the IP address of the service processor
Connect a RS-232 cable from the HMC to the service processor
第17题:
IBM System p5 570
IBM System p5 575
IBM System p5 590
IBM System p5 595
第18题:
The routes on the HMC
The firewall setting of the LAN adapter
The name resolution protocol on the p5 590 server
The subnet mask settings on the Ethernet adapters
第19题:
A public internet connection
All of the Logical Partitions need to be active
One partition must be configured with Service Authority
A local Repository must be configured prior to the update
第20题:
When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware.
V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions.
When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.
V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.