In the following statements about graph operations,which one is NOT correct?
A.Finding critical path is an operation on directed graph
B.Finding critical path is an operation on undirected graph
C.Spanning tree of a graph may not be unique
D.Minimum spanning tree of a graph may not be unique
第1题:
112 The schedule risk is the _____ .
A. the accumulated "expected' durations which maintain project completion.
B. Critical Path adjusted by "high-risk" activity float.
C. highest risk path that maintains quality.
D. Critical Path when calculated with "most likely" duration.
E. highest risk path that contributes the most risk toward the project completion
第2题:
● Which of the following impacts the critical path?
A Changing the task duration.
B Reduce the free float of an activity.
C Executing a backward pass
D A or B
E None of the above.
第3题:
In the following kinds of graphs, which one's adjacency matrix is symmetric?
A.Directed graph
B.Undirected graph
C.AOV network
D.AOE network
第4题:
第5题:
Which of the following technologies can be used in distance vector routing protocols to prevent routing loops?()
第6题:
Which two statements about an IDS are true?()
第7题:
Spanning Tree Protocol calculates path cost based on which of these? ()
第8题:
Network A has a spanning-tree problem in which the traffic is selecting a longer path. How is the path cost calculated?()
第9题:
The path cost can be changed for an interface using the spanning-tree cost command
The path cost can be changed for an interface using the stp path-cost command
The SPT default path cost depends on the interface speed
The STP default path cost is similar for all interface
第10题:
number of hops
priority of the bridge
interface bandwidth
interface delay
None of the above
第11题:
interface bandwidth
interface delay
interface bandwidth and delay
hop count
bridge priority
第12题:
expansion space to leave in a tank
flash point at which the fuel will burn
temperature to which the fuel must be heated
rate at which the fuel can be pumped during transfer operations
第13题:
● The critical path is calculated by
A subtracting the end date of task one from the start date of task two.
B determining which tasks have the least amount of total slack.
C totaling the time for all activities.
D determining the shortest path through the network.
E Determining which tasks have the most slack
第14题:
● Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:
A This is a valid representation if the logic is correct.
B This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.
C This is invalid because nodes cannot have both dummy inputs and dummy outputs.
D This is a invalid because the number of outputs must equal the number of inputs.
E This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.
第15题:
A.Mirroring, with the write-verify option turned on, can be used to increase performance.
B.Mirroring is a better choice that disk-striping, for large sequential-access file system when one is looking for performance.
C.Mirroring, with a parallel-scheduling policy, may improve I/O read-operation performance.
D.Mirroring, with maximum inter-disk allocation policy, is used to enhance availability.
第16题:
第17题:
Which two statements about spanning tree path cost are true?()
第18题:
Several @functions can execute multiple statements. Which one of the following initializes a variable and can increment in during the operation?()
第19题:
By default, which of the following factors determines the spanning-tree path cost?()
第20题:
Which of the following statements is mot correct about mirroring?()
第21题:
hose joints are made up
tanks are being topped off
system is being lined up
pumping operation is first started
第22题:
Switch(config-if)#spanning-tree guard root
Switch(config-if)#spanning-tree portfast
Switch(config-if)#switchport mode trunk
Switch(config-if)#switchport mode access
第23题:
It is the individual link cost based on latency
It is the sum of the costs based on bandwidth
It is the total hop count
It is dynamically determined based on load