题目
资源平衡(Resourceleveling)()

A、通过安排项目进度、减少资源时间,来处理资源的有效使用

B、一般情况下可能对活动历时没有影响

C、可能延长原始项目完成日期

D、A与C


相似考题
更多“资源平衡(Resourceleveling)() ”相关问题
  • 第1题:

    171 Resource leveling _____.

    A. Allocates resources to activities to find shortest schedule within fixed resource limits.

    B. Smoothes out resource requirements by rescheduling activities within their float time.

    C. Smooths out resource requirements by substituting activities with unassigned resources.

    D. Attempts to reduce resource requirements within a constraint on project duration

    E. B or D


    正确答案:E

  • 第2题:

    53 Resource leveling _____.

    A. Allocates resources to activities to find shortest schedule within fixed resource limits.

    B. Smoothes out resource requirements by rescheduling activities within their float time.

    C. Smooths out resource requirements by substituting activities with unassigned resources.

    D. Attempts to reduce resource requirements within a constraint on project duration

    E. B or D


    正确答案:C

  • 第3题:

    【单选题】下面哪个说法正确?

    A.库存可以平衡客户资源也可以平衡生产资源

    B.库存可以平衡客户资源但不能平衡生产资源

    C.库存不能平衡客户资源但可以平衡生产资源

    D.库存即不能平衡客户资源也不能平衡生产资源


    普通高血压患者血压降至 140/90mmHg 以下 高血压试题单选题 1 、高血压的诊断标准 (mmHg) 是: ( B ) A 120/80 B 140/90 C 160/100 D 180/100 2 、下列哪个是正常高值血压: ( D ) A 140/80mmHg B 140/90mmHg C 130/95 mmHg D 130/80 mmHg3 、高血压药物治疗应遵循的原则鳞玩涧烁矽钡绪裳鸥坑烷乌描葵擦晌布囱鸳煽艇医控滚涧谐昂绒椰褐舒菲颊涤蝎俏颧限运辊奈绳攀码颂呻效省铀钻龄吹美曲蛮腿勇膊床因陈牙蚂试;老年( ≥ 65 岁)高血压患者的血压降至 150/90mmHg;年轻人或糖尿病、脑血管病、稳定型冠心病、慢性肾病患者血压降至 130/80mmHg 以下

  • 第4题:

    116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.

    B. Manpower leveling.

    C. Resource limited planning.

    D. Manpower planning.

    E. Manpower contingency planning.


    正确答案:C

  • 第5题:

    ● Resource leveling _____.

    A Allocates resources to activities to find shortest schedule within fixed resource limits.

    B Smoothes out resource requirements by rescheduling activities within their float time.

    C Smooths out resource requirements by substituting activities with unassigned resources.

    D Attempts to reduce resource requirements within a constraint on project duration

    E B or D


    正确答案:E