the ship has been named
the ship has been built
the ship has been signed
the ship has been registered
第1题:
Where a charter-party specifies the estimated time of arrival of a vessel at the port of loading, there is ________ on the shipowners to sail to there on the date on which when proceeding with all convenient speed it would normally reach the port on or about the estimated date of arrival.
A.a necessary right
B.an absolute observation
C.an absolute obligation
D.a possible solution
第2题:
第3题:
The forward part of the ship on port is called the().
第4题:
Which ports must be left open if an administrator plans to perform Dynamic LPAR operations?()
第5题:
A Company switch was configured as shown below: switchport mode access switchport port-security switchport port-security maximum 2 switchport port-security mac-address 0002.0002.0002 switchport port-security violation shutdown Given the configuration output shown above, what happens when a host with the MAC address of 0003.0003.0003 is directly connected to the switch port? ()
第6题:
by
on
to
in
第7题:
the call sign and name
the official number and name
the port of registry and name
the port of registry and official number
第8题:
The host will be allowed to connect.
The port will shut down.
The host can only connect through a hub/switch where 0002.0002.0002 is already connected.
The host will be refused access.
None of the other alternatives apply
第9题:
in the loading place
in the port or dock
in the loading spot
in the discharging spot
第10题:
an optional
a reasonable
an absolute
rational
第11题:
not required to be marked anywhere on the vessel
required to be marked on both bows and on the keel
required to be marked on the stern with the name of the vessel marked on both bows
required to be marked on the keel, stern, and both bows
第12题:
on
of
in
to
第13题:
Where the Shipowner has accepted the port of discharge named by the Charterer,he must go there although it is not prospectively safe,and claim damages for injury ______ the ship by reason of the port not being safe.
A.by
B.on
C.to
D.in
第14题:
--- Port five! ----Port five!()!
第15题:
Which three flow-control port states lead to enabled link flow control? ()
第16题:
Repaint the draft figures, plimsoll marks, ship’s name and port of registry ().
第17题:
Which of the following allows a WAP to be installed in a location where there are no power outletsavailable?()
第18题:
port 21(ftp):tcp and port 657(rmc):tcp
port 22(ssh):tcp and port 657(rmc):udp
port 657(rmc):tcp and port 657(rmc):udp
port 161(snmp):tcp and port 161(snmp):udp
第19题:
with red lead paint
in red and white paint
in original color
all of the above
第20题:
neither,nor
not only,but also
not,but
not only, and but
第21题:
root port,designated port,alternate port,backup port,and disabled
standby port,alternate port,root port,and disabled
standby port,designated port,backup port,and disabled
root port,designated port,alternate port,and standby port
第22题:
are
is
were
was
第23题:
Receive port: Enabled, Transmit port: Enabled
Receive port: Enabled, Transmit port: Desired
Receive port: Enabled, Transmit port: Disabled
Receive port: Disabled, Transmit port: Desired
Receive port: Desired, Transmit port: Desired