You plan to have a larger moving window size for the default system-defined moving window baseline because you want to use the adaptive threshold. Which statement factors in this consideration while increasing the size of the moving window?()A、The collect

题目

You plan to have a larger moving window size for the default system-defined moving window baseline because you want to use the adaptive threshold. Which statement factors in this consideration while increasing the size of the moving window?()

  • A、The collection level for the AWR should be set to BASIC
  • B、The moving window size must be less than Undo Retention
  • C、The moving window size should be greater than the Automatic Workload Repository (AWR) retention period
  • D、The moving window size should be equal to or less than the Automatic Workload Repository (AWR) retention period

相似考题
更多“You plan to have a larger moving”相关问题
  • 第1题:

    It will enable you to plan your activities so that you have adequate time for both work and play.


    参考答案:它能让你为你的行动做出计划使你有充足的时间学习和玩耍。

  • 第2题:

    You plan to have a larger moving window size for the default system-defined moving window baseline because you want to use the adaptive threshold. Which statement factors in this consideration while increasing the size of the moving window?()

    A. The collection level for the AWR should be set to BASIC

    B. The moving window size must be less than Undo Retention

    C. The moving window size should be greater than the Automatic Workload Repository (AWR) retention period

    D. The moving window size should be equal to or less than the Automatic Workload Repository (AWR) retention period


    参考答案:D

  • 第3题:

    Do you have any plan this year?()

    AHow about you?

    BI plan to go to the United States for further studies.  

    CYes, I will. 

    DI'm certainly not going to do that kind of thing.


    B

  • 第4题:

    Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()

    • A、 A window must have been created with the WEEKEND_PLAN resource plan.
    • B、 A program must have been created with the WEEKEND_PLAN resource plan.
    • C、 A job class must have been created with the WEEKEND_PLAN resource plan.
    • D、 A windows group must have been created with the WEEKEND_PLAN resource plan.

    正确答案:A

  • 第5题:

    You have an Exchange Server 2010 organization.  You plan to delegate administration of the organization.  You have a group named Technicians that contains all the level-two technicians in the organization. You need to ensure that the Technicians group can manage the properties of all the mailbox databases. The solution must minimize the number of permissions assigned to the Technicians group.  Which management role should you assign to the Technicians group?()

    • A、Help Desk
    • B、Organization Management
    • C、Recipient Management
    • D、Server Management

    正确答案:D

  • 第6题:

    You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named DB1 in the instance. You put forward a database maintenance plan. The maintenance plan rebuilds indexes, checks database integrity, writes a report to a text file. Now the company requires that when the maintenance plan executes abnormally, the operators can be notified by an e-mail message. You've been assigned this task. So you have to make modifications on the SQL Server instance. What should you do?()

    • A、For the SQL Server Agent, you should enable a fail-safe operator 
    • B、You should modify the database maintenance plan, making it send an e-mail to the appropriate operators 
    • C、You should modify the database maintenance plan, making it include a Notify Operator task that e-mails the appropriate operators. 
    • D、You should modify the SQL Server Agent job. The job executes the database maintenance plan to notify the appropriate operators.

    正确答案:D

  • 第7题:

    单选题
    You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()
    A

    generic router and switch configuration parameters

    B

    end-to-end test plan after all components have been installed and  configured

    C

    administrator assignments

    D

    rollback plan


    正确答案: A
    解析: 暂无解析

  • 第8题:

    问答题
    Practice 1  Suppose you have made an appointment with your friend at 5 p.m., but you have some urgent business to attend to and have to cancel your appointment. Write a note to your friend.  (1) explaining why you have to cancel your appointment  (2) making an apology for that  (3) telling him how you plan to make up for it  You should write approximately 100 words. Do not sign your own name at the end of your note. Use “Wang Lin” instead.

    正确答案: 【范文】
    Dear Sally,
    I’m sorry to tell you I have to cancel the appointment with you. My friend just told me she was coming to see me tomorrow. She will arrive at 4:45 p.m. tomorrow, So I have to go to the station to pick her up. I really feel sorry about it. Can we make it another day? I will be free on Saturday, maybe we can meet on Saturday at 10:00 a.m.. If it is also good for you please let me know.
    Sorry again for canceling the appointment. Hope everything goes on well with you.
    Yours sincerely,
    Wang Lin
    解析: 暂无解析

  • 第9题:

    单选题
    Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
    A

    Add CPU and memory COD so they have room to grow if required

    B

    Make the server configuration twice as large as the current requirement

    C

    Configure the server for the current capacity requirements

    D

    Make the server configuration a little larger than the current capacity requirements


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()
    A

     assign users to consumer groups

    B

     set the resource plan for the instance

    C

     configure a simple resource plan and specify plan directives

    D

     configure a complex resource plan and specify plan directives


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()
    A

    Compute the baseline statistics.

    B

    Take an immediate AWR snapshot.

    C

    Decrease the window size for the baseline.

    D

    Decrease the expiration time for the baseline.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()
    A

    approval from senior management

    B

    end-user requirements

    C

    IEEE 802.1X authentication parameters

    D

    a summary implementation plan


    正确答案: A
    解析: 暂无解析

  • 第13题:

    You have an existing Windows Communication Foundation (WCF) Web service. The Web service is not responding to messages larger than 64 KB. You need to ensure that the Web service can accept messages larger than 64 KB without generating errors. What should you do?()

    A. Increase the value of maxReceivedMessageSize on the endpoint binding.

    B. Increase the value of maxRequestLength on the httpRuntime element.

    C. Increase the value of maxBufferSize on the endpoint binding.

    D. Increase the value of maxBufferPoolSize on the endpoint binding.


    参考答案:A

  • 第14题:

    You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()

    A. Compute the baseline statistics.

    B. Take an immediate AWR snapshot.

    C. Decrease the window size for the baseline.

    D. Decrease the expiration time for the baseline.


    参考答案:A

  • 第15题:

    What is a critical piece of information that you should have when creating a VLAN-based implementation plan?()

    • A、approval from senior management
    • B、end-user requirements
    • C、IEEE 802.1X authentication parameters
    • D、a summary implementation plan

    正确答案:D

  • 第16题:

    You have an Exchange Server 2010 organization.  All users access their mailboxes by using Outlook Web App (OWA).  You need to plan a solution to reduce the number of e-mail messages that are accidentally sent todistribution groups that contain company executives.  What should you include in the plan?()

    • A、custom MailTips
    • B、dynamic distribution groups
    • C、Outlook Protection Rules
    • D、sharing policies

    正确答案:A

  • 第17题:

    You have an Exchange Server 2010 organization.  You need to plan a message hygiene solution that meets the following requirements:.Spoofing must be minimized .Open SMTP relays must be added to IP block lists automatically  What should you include in the plan?()

    • A、Sender ID filtering and recipient filtering
    • B、Sender ID filtering and sender reputation
    • C、sender filtering and recipient filtering
    • D、sender reputation and recipient filtering

    正确答案:B

  • 第18题:

    单选题
    Picking up books that vaguely interest you can be dangerous because _____.
    A

    you may forget about the book you plan to buy

    B

    you have to give up the best-selling book

    C

    it makes you break your appointment

    D

    it costs you too much money and time


    正确答案: B
    解析:

  • 第19题:

    问答题
    Practice 4  ● A foreign business associate is visiting your company for three days. You have been asked to organize the visit and plan appropriate entertainment.  ● Write a letter to the visitor outlining a timetable for the visit and describing the activities you have planned.  ● Write 200-250 words on your Answer Sheet.

    正确答案: 【参考范文】
    Dear Richard,
    Further to our discussion of 6 May, I’m writing to present the scheduled programme during your visit to our company(12—15 May). I‘ll be waiting at the airport on Tuesday morning. If the airliner arrives on time, I’11 take you right to your hotel. Then you can have a rest and refresh yourself. As Mr. Cooper desires to see you before the meeting, you will have a private talk. After that we’ll travel to the company site for the meeting which according to the schedule will run form 15:30 to 17:00. Since that will be a busy day, I recommend a complete relaxation at a nearby entertainment centre. Wednesday’s meeting is due to start at 10:00a.m. A limousine has been arranged to collect you from the hotel at 9 : 40a.m. As the meeting will last for a whole day, we will have a working lunch. When work’s finished, you’11 have some free time at your disposal before attending a welcome banquet to be held at The Sheraton Hotel at 19: 00.
    We have enter your name for the Tennis Tournament (9:30 a.m on Thursday morning). Mr. Cooper will pick you up at the hotel at 9:00a.m. Then there is a cocktail party at 12:30 a.m, which some important local government officials will attend.
    A sedan will pick you up at your hotel at 9:50a.m on Friday morning to send you to the airport in time for your return flight at 11:50a.m. I’m looking forward to seeing you on the 12th. At the meanwhile, if you have any questions, please do not hesitate to contact me at 01082253922.
    Yours sincerely,
    Mary Young
    Personal Assistant to Mr. Cooper
    解析: 暂无解析

  • 第20题:

    单选题
    Do you have any plan this year?()
    A

    How about you?

    B

    I plan to go to the United States for further studies.  

    C

    Yes, I will. 

    D

    I'm certainly not going to do that kind of thing.


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()
    A

     A window must have been created with the WEEKEND_PLAN resource plan.

    B

     A program must have been created with the WEEKEND_PLAN resource plan.

    C

     A job class must have been created with the WEEKEND_PLAN resource plan.

    D

     A windows group must have been created with the WEEKEND_PLAN resource plan.


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    You have an Exchange Server 2010 organization.You plan to enable Federated Sharing.You need to create a DNS record to store the Application Identifier (AppID) of the domain for the federated trust. Which type of record should you create?()
    A

    A

    B

    CNAME

    C

    SRV

    D

    TXT


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users.   Which step must be performed before you can start using the resource plan?()
    A

    assign users to consumer groups

    B

    set the resource plan for the instance

    C

    configure a simple resource plan and specify plan directives

    D

    configure a complex resource plan and specify plan directives


    正确答案: A
    解析: 暂无解析